Totally Technical Statistics

Totally Technical Statistics
Top width of barrel22'6'' - 6.86m
Depth8'8'' - 2.6m
Length10,452 ft - 3186m
Elevation Drop (approx.)5.5 ft - 1.7m
Maximum Height61 ft - 18.6m
Anticipated Capacity900 cfs - 25 cms
Achieved Capacity640 cfs
Perimeter of Barrel33 ft - 10m
Walkways24'' on each side = 2'
Shell Thickness5''
Transverse girders13.75'' x 12'' - 35 x 30 cm
Twin Columns516 at 20' - 6m spacing
Expansion Joint Spacing80 ft - 6m
Footings (spread type)
top1'8'' x 1'8'' - .5 x .5m
bottom8' x 8' - 2.5 x 2.5m
depth8'6'' - 2.6m
Mean Velocity3.5 feet/second - 1m
Amount of Concrete used24,300 cubic yards
Amount of Reinforcing Steel used2,000,000 lbs - 900,000 kg
Construction costs$559,287 - $700,000
 